gitoria

calendar

All repositories: gitoria

ReadmeCodePull requestsReleasesTicketsSettings
Commitce16a4efce16a4efdeploy: backup copies index files first and *.mpack data last (hot-copy skew, hybriel #203)mrece16a4ef/missions/003-notifications-never-fired.md

1.7 KB

  1. # calendar mission 003 — calendar#9: event notifications never fired once (follow-up to #4)
  2. Ticket: https://tickets.worldapi.org/calendar.worldapi.org/9 (read it + #4 with curl -H 'Accept: text/markdown' https://tickets.worldapi.org/api/projects/calendar.worldapi.org/tickets/9).
  3. caramboleyo: "the calendar event notifications did not work once. i think they are unfinished".
  4. 1. EVIDENCE first: find out why no reminder ever reached him. Look at every link: permission request, service worker (hl:web), the browser
  5. timers (arm()), `soon` state, notify through the worker, a closed app (README says: no server push = nothing fires when closed), and the
  6. offline path. Reproduce in a real Chrome (mobile emulation 390 px, like his phone) with an event 2 min ahead: app OPEN, app in a BACKGROUND
  7. tab, app CLOSED. Write down what fires where, on OLD code (live commit c6809c7). Live logs on byrodin are read-only for you: ask nothing, just
  8. use the repo + a copy of the newest backup in /media/STORAGE/deploy-backups/ (az5b2 session in the copy).
  9. 2. FIX so that a reminder reaches him with the app open AND closed. Closed needs a server-side scheduler + Web Push (VAPID) — check what
  10. Hybriel (hl:web, hl:push or similar) offers; at a Hybriel gap STOP with a minimal repro in your scratch dir and report it (no JS workaround).
  11. 3. Gate: a test that fails on old code and passes on new: event 2 min ahead (fake clock allowed), open / background / closed, the notification
  12. is shown (Chrome's notification via CDP or the worker's showNotification record). Real-data check on a backup copy.
  13. Report: reports/003-notifications-never-fired.md — the cause with evidence, what fires where before/after, steps for caramboleyo to test on his phone.

Branches

Latest commits

  • ce16a4efdeploy: backup copies index files first and *.mpack data last (hot-copy skew, hybriel #203)mre
  • f490bc8cdeploy: Web Push gate tests/push.mjs (PUSH_GATE_PORT)mre
  • 3af29fc8calendar mission 008 (A8): report, README, LOG, push-shots.mjsmre
  • f91f3663calendar mission 008 (A8): push only asked of the browser when the app has the VAPID settings (pushAvailable); real-FCM E2E scripts (push-real-app.mjs, push-real.mjs)mre
  • bf571badcalendar mission 008 (A8): Turn off on this device (unsubscribes the browser, server drops the device, choice kept), subscribe/refresh when the app is shown again; push gate part 3mre
  • 50985708calendar mission 008 (A7): Web Push report, README, mission, LOGmre
  • ee318774calendar mission 008 (A7): push-real.mjs, push sent log linemre
  • ebda0fd1calendar mission 008 (A7): server-side reminder plan on hl:time (push-plan.hl; hl:time fromLocal in a browser static is refused: repro .scratch/hltime-client), push gate 9/9mre
  • d063dad3calendar mission 008 (A7): Web Push (WIP): lib/push.hl subscriptions + sender clock, faces calPushSave/calPushOff, button subscribes, VAPID tool, tests/push.mjs; instantOf on hl:timemre
  • cf175c80calendar mission 008 (A7): re-vendor Hybriel master 0e3c9830 (bin 9d957fed, plugins whole: hl:crypto Web Push primitives, hl:web sendPush)mre
  • 9bf3c38bcalendar mission 008: re-vendor Hybriel f9833544 (gates old = new); Web Push stopped: hl:crypto half missing on mastermre
  • 186f969bcalendar mission 007: signed-in gate for the first-pointer race (fails on 3c5604f), README theme section, reportmre
  • ba9b4955calendar mission 006: first pointer event no longer re-runs the month (stale overwrite race), gate check, e2e settings cleanup, reportmre
  • bd730759calendar mission 006: theme move (WIP): brief, report, LOG, STATUSmre
  • b117b153calendar mission 006 WIP: reminder row fields keep 44 px; e2e script flagsmre
  • 53e3b0debrowser gate: Log out through the user menu, theme colour rgb(15, 20, 25)mre
  • 90bf9e2ecalendar mission 006 WIP: theme dbe3de7, theme shell (AppHeader/MainMenu/UserMenu/Sidebar/ContentFirst), styles cut to the app's own rules, check-theme gate, e2e toolsmre
  • 3c5604f9identkit: refuse a taken ident port, cold-start deadline, abort on dead ident, clear no-code error (as notes)mre
  • 4996bbe7paths: projects moved into /media/STORAGE/projects/WorldAPI/mre
  • f5bf0803calendar mission 004: re-vendor Hybriel to the shared static build 0f396652; compose cache volume + tmpfs; notify-paths gate in deploy.sh; gate start waits 150 s; reportmre