calendar
All repositories: gitoria
- tests
- README.md13.4 KB
- http1.zig148.3 KB
- libhttp1.so168.6 KB
- libhttp1.so.inputs.json672 B
- native_http_server.hl4.2 KB
- native_web_socket_server.hl4.0 KB
- plugin.json77 B
- response.hl1.0 KB
- server.hl1.1 KB
- web_socket_client.hl3.3 KB
- ws_client.hl1.0 KB
Branches
- mainmain branch
Latest commits
- d6c59290calendar: Hybriel master 06617221 (plugin allocators 3a781359 + 413f60e4, mpackdb 2cb7ae5e, http1 773de63e); gates 78/0 + 18/0mre
- 7bd0337ccalendar: Hybriel master 190aa11d (fc838894 GC correctness, #126 closure scopes, #127); gates 78/0 + 18/0mre
- ff41310ccalendar: Hybriel master 8efba065 (#126 memory, #48 lambda copy; audit: no & needed)mre
- 14ba08c7antcolony#40: mission references point to the moved missionsmre
- 99c73346antcolony#40: history (LOG.md), worker briefs (missions/) and reports moved here from antcolony, numbered per project; old numbers in antcolony docs/mission-map.mdmre
- 76edaa62calendar: Hybriel master ff51cf46 (re-vendor round, static workaround removed)mre
- 90a3fc2cdeploy.sh: back up live storage/.sessions/.env before every deploy (newest 5 kept)mre
- 6722b72ddeploy.sh: never send .git or .gitignore to Byrodinmre
- be099807State of 2026-09-27, before the move to gitoriamre