calendar
All repositories: gitoria
- components
- icons
- plugins
- shared
- tests
- tools
- .gitignore172 B
- CONCEPT.md2.7 KB
- DECISIONS.md647 B
- Dockerfile503 B
- LOG.md7.6 KB
- README.md9.0 KB
- STATUS.md15.4 KB
- deploy.sh8.5 KB
- docker-compose.yml1.0 KB
- events.hl9.2 KB
- login.js2.6 KB
- project.hl4.8 KB
- styles.hl4.7 KB
- users.hl5.2 KB
Branches
- mainmain branch
Latest commits
- ff41310ccalendar: Hybriel master 8efba065 (#126 memory, #48 lambda copy; audit: no & needed)mre
- 14ba08c7antcolony#40: mission references point to the moved missionsmre
- 99c73346antcolony#40: history (LOG.md), worker briefs (missions/) and reports moved here from antcolony, numbered per project; old numbers in antcolony docs/mission-map.mdmre
- 76edaa62calendar: Hybriel master ff51cf46 (re-vendor round, static workaround removed)mre
- 90a3fc2cdeploy.sh: back up live storage/.sessions/.env before every deploy (newest 5 kept)mre
- 6722b72ddeploy.sh: never send .git or .gitignore to Byrodinmre
- be099807State of 2026-09-27, before the move to gitoriamre